Customized Production Line Automation for Washing Machine Drums
Contact Supplier
Product Highlights
- High-Speed Assembly: Technical cycle time is 15 seconds with individual machine cycles ranging from 10S to 15S.
- Multi-Model Flexibility: Capable of producing several variants and 3 models through quick tool and block changes.
- Rapid Changeover: Changeover time is within 10 minutes for different production models.
- Comprehensive Safety: Features two-hand pneumatic switches, grating protection, and mechanical locks on safety doors.
- Precision Measurement: Run-out data is controlled to be less than or equal to 2.0 using digital display dial gauges.
- Full Customization: Offers full, flexible, and minor customization from samples or designs.
- OEM/ODM Services: Provides both OEM and ODM services with 22 R&D engineers.
Product Attributes
- Customization
- Available
- Condition
- New
- Automation
- Automation
- Model NO.
- WM-02-08
- After-sales Service
- Negotiable
- Warranty
- 12 Months
- Transmission Type
- Flexible
- Automatic Production Line
- Assembly
- Certification
- ISO
- Flexible Production
- Intelligent Manufacturing
- Rhythm
- Flow Production Line
- Production Scope
- Parts Production Line
- Transport Package
- Wooden Cases, Vacuum Packing, Anti-Rust Oil
- Specification
- Non-standard
- Trademark
- IDO
- Origin
- China
- HS Code
- 8479899990
- Production Capacity
- 20 Sets/Year
- Package Size
- 900.00cm * 230.00cm * 230.00cm
- Package Gross Weight
- 20000.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Customized Production Line Automation for Washing Machine Drums
Find Similar Products
Product Description
Notes:
1. Technical cycle time: 15S.
2. Space: 12*3m.
3. Labor requirement: 7 persons.
| No. | Machine name | Q'ty | Cycle-time | Remark |
| 1 | Rolling machine | 1 set | 10S | |
| 2 | lock-seaming machine | 1 set | 12S | |
| 3 | Grooving machine | 1 set | 15S | |
| 4 | Manual assembling & screwing table | 1 set | 15S | Including 2 pneumatic screwing guns |
| 5 | Edge covering & curling machine | 1 set | 15S | |
| 6 | Run-out check machine | 1 set | 15S |
1. It can be used to produce several variants.
2. The adjustment of rolling shape is achieved by adjusting the gap among the three rubber covered rollers.
1. Manually carry out v-bending, then seaming.
2. It can be used to produce several variants through changing the corresponding seaming tool.
3. Tensile strength: ≥1800N/50mm
2. Design two-hand pneumatic switches with grating protection. All safety doors are designed with mechanical locks.
3. Use SEW motor to drive the inner bracing modules.
4. The grooving assembly is driven by a servo motor.
5. Adjust the grooving position and depth through HMI.
2. Manual screwing: 2 persons at the same time
3. Equip 2 screwing guns.
4. It can be used to produces 3 models through changing the locating block.
5. The changeover can be done within 10 minutes.
2. Design two-hand pneumatic switches with grating protection. All safety doors are designed with mechanical locks.
3. Use SEW motor to drive the inner bracing modules.
4. The curling and edge wrapping assembly is driven by a servo motor.
5. Adjust the curling and edge wrapping positions through HMI.
1. Manually fix the drum on the test jig and place the test ring.
2. The drum rotates slowly driven by the servo motor.
3. Using digital display dial gauge feedback run-out data, run-out data ≤ 2.0.
4. For different drums, it is necessary to make inspection jigs and rings of different specifications.
| No. | Name | Brand |
| 1 | Servo motor | Mitsubishi or Siemens |
| 2 | Gear motor | SEW or Siemens |
| 3 | 3-phase asynchronous motor | Siemens |
| 4 | Touch screen | Mitsubishi or Siemens |
| 5 | PLC | Mitsubishi or Siemens |
| 6 | Pneumatic component | SMC or FESTO |
| 7 | Hydraulic component | REXROTH |
| 8 | Adhesive dispensing component | Graco or Nordson |
| 9 | Inductive switch | Omron or SICK or Keyence |
| 10 | Guide rail and sliders | HIWIN or THK |
| 11 | Bearings | NSK |
| 12 | Optical grating | SICK |
| 13 | Robot | ABB or KUKA |


About the Supplier
This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2441096". Items marked "" are certified.
Company Profile
IDO is a reliable partner providing customized metal forming and assembly solutions for the home appliance industry.
IDO has more than 10 years of experience in the industry, designing and manufacturing flexible automatic or customized machines for sheet metal parts such as washing machines, dryers, refrigerators, dishwashers and microwave ovens. Production and assembly lines include die, punching, shearing, bending, laser and plasma welding, clinching, riveting and screwing technologies. All dies used in the production line are designed and manufactured by SUNSN, a subsidiary company of IDO.
IDO is a China company, located in Jiangsu Province, near Shanghai. IDO is currently improving its three major R&D centers: Mold business
R&D center, non-standard business
R&D center, and standard business
R&D center. With technology
Empowerment, we are fully
Committed to providing customers
With humanized and cost-effective
Technical solutions. IDO devotes to establish long-term strategic partnership with business partners, continuously improve product technology and process, strive to achieve continuous reliability, competitive price, delivery time and quality service.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No 22, Xigang Road, Wuxi, Jiangsu, China
-
Plant Area
- 8400 square meters
-
Number of Employees
- 87
-
Registered Capital
- 10,000,000 RMB
-
Terms of Payment
- LC, T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 1-3 months -
Nearest Port
- shanghai port, ningbo port
-
Minimum Order Quantity
- 1 Set
-
Supply Chain Partners
- 50
Our Production Capability & Technical Expertise
- Main Products
- Dishwasher Tub Assembly Line, Washing Machine Drum Assembly Line, Metal Sheet Stamping Die, Refrigerator Production Lines, Kitchen Oven Production Lines, Washing Machine Production Solution, Dishwasher Production Solution, Washing Machine Cabinet U Bending Machine, Washing Machine Cabinet Rivieting Machine, Washing Machine Cabinet Clinching Machine
-
Production Lines
- 2
-
Production Machines
- Wire cutting machine, CNC, CNC (2), Punching machine, Punching machine2, Rocker arm drilling machine
-
QA/QC inspectors
- 5 people
-
Inspection Type for Finished Products
- 100% inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Minor Customization, Full Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 22 people
-
Traceability of Raw Materials
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2014-12-29
-
Export Year
- 10 Years
-
Main Markets
- Southeast Asia/ Mideast, Aouth asia
-
Repeat Buyers Choice
- 80%~100%
-
Number of Foreign Trading Staff
- 8
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015
-
Cooperated with Fortune 500
- Yes
FAQ
- What is the technical cycle time for the assembly line?
- The technical cycle time is 15 seconds.
- How much space does the production line require?
- The required space is 12 meters by 3 meters.
- How many operators are needed for the line?
- The labor requirement is 7 persons.
- Can the line produce different models?
- Yes, it can produce several variants and 3 specific models by changing tools or locating blocks.
- What is the changeover time between models?
- The changeover can be completed within 10 minutes.
- What is the maximum run-out data allowed?
- The run-out data is less than or equal to 2.0.
- Is customization available for this production line?
- Yes, full customization, flexible customization, and customization from samples or designs are available.
- What is the warranty period for the equipment?
- The warranty period is 12 months.
- What is the minimum order quantity?
- The minimum order quantity is 1 set.
Send your message to this supplier
People who viewed this also viewed
-
US$159.00-208.00 / Piece
-
US$150,000.00 / Set
-
US$150,000.00 / Set
-
US$50,000.00 / Set
-
US$50,000.00 / Set
-
US$50,000.00 / Set
-
US$50,000.00 / Set
-
US$50,000.00 / Set
-
US$50,000.00 / Set
Find Similar Products By Category
- Supplier Homepage
- Products
- Washing machine drum production line
- Top-loading type
- Customized Production Line Automation for Washing Machine Drums
Related Categories
Hot Searches
- Machine Line
- Production Line Factories
- Plastic Machine Line
- Washing Line Factories
- Automation Production Line
- Washing Machinery Line
- CE Washing Production Line
- Automation Washing Line
- ISO Washing Production Line
- Customized Automation Line Bulkbuy